- Home
- Home Refurbishments
Home Refurbishments in London
A refurbishment goes wrong when five trades each blame the other four. We run kitchens, bathrooms and whole-house renovations as one job: strip-out, first fix, plastering, fitting and decorating, in the right order, by people who work together every week.
What is included
Kitchens, bathrooms and whole houses.

- Kitchen renovationsStrip-out, plumbing and electrics, plastering, units, worktops, tiling and flooring. Supply and fit, or fit only.
- Bathroom renovationsBathrooms, en-suites and wet rooms, properly tanked, tiled and ventilated.
- Full-house refurbishmentRewires, replumbs, new heating, replastering, joinery and decoration, programmed room by room.
- Plastering & decoratingSkimmed walls and ceilings, restored cornices, and a paint finish that stands up to daylight.
- Structural alterationsKnocking through, steel beams and chimney breast removals, with calculations and building control sign-off.
How it works
Four steps. No surprises.
Tell us about the job
Answer a few quick questions online or call us. It takes about a minute, and a real person reads every enquiry.
Free site visit
We come to you, measure up, look at access and talk through options. No charge, no pressure.
Fixed written quote
An itemised price and a start date, normally within 24 hours of the visit.
Build and handover
One point of contact, a tidy site each evening, and a walk-round with you before the final invoice.
FAQ
Refurbishments: your questions
Not answered here? Call 07595 386864 and ask us directly.
Do you supply the kitchen or bathroom, or just fit it?
Either. We can fit a kitchen or suite you have already bought, or supply through our trade accounts. The quote separates labour from materials so you can see what each choice costs.
Will I get a fixed price?
Yes. After a site visit you get a written, itemised quote. If you change the scope or we find something hidden, such as rotten joists under a bath, we price it and agree it with you before carrying on.
How long does a bathroom or kitchen take?
A bathroom is typically two to three weeks. A kitchen is three to five weeks depending on worktop lead times and whether walls are moving.
Are your electricians and gas engineers certified?
Electrical work is carried out and certified by qualified electricians, and gas work by Gas Safe registered engineers. You receive the certificates at handover.
Areas
Refurbishments near you
We carry out home refurbishments in every London borough. Choose yours for local detail.
Ready when you are.
Tell us about the job in about a minute. We reply within 24 hours with a time for your free site visit.